A downloadable game for Windows

PTTM - is a metroivania, based on momodora and castlevania, the game is not finished but this is a playable 1-4 area demo, some things are still bugged, enjoy
actual version:
- area 1, carmesin forest
-area 2, nonoria city
-area 3, castle entrace
-area 4, stone garden
-4 bosses ( 1 secret )
-load and save game
-ctrl to open map
castle entrace music by sagelapis

Download

Download
Praise To The Moon DEMO final.rar 97 MB
Download
PTTM banner.png 664 kB

Install instructions

just download, extract and play :3
( gabriel burro lol )

Development log

Leave a comment

Log in with itch.io to leave a comment.